Via Massarenti
The project, initially conceived for the aesthetic and functional redevelopment of the building, was expanded to include energy efficiency and seismic improvement following an analysis that revealed significant deficiencies in these areas. Structural interventions included reinforcing the load-bearing walls with reinforced concrete, consolidating the floors, and replacing the pitched roof with a flat one.
For energy efficiency, a thermal insulation system was installed, mechanical systems were replaced with heat pumps, and a new photovoltaic system was implemented. The pharmacy on the ground floor and the medical offices on the upper floors underwent a complete restyling.
To renew the building's external appearance, the balcony railings on the main façade were replaced with new decorative railings featuring full-height wooden slats between the balconies and the roof, possibly adorned with greenery. Additionally, the external elevator was replaced. Finally, the internal courtyard flooring will be redone with a new architectural pavement.
The works are ongoing, with completion expected by 2025.