Safeguarding of the Railway Embankment on the Lamone River
In 2023, the flood that hit the Emilia-Romagna region caused the rupture of the embankment at km 22+600 of the Castelbolognese – Ravenna railway line, adjacent to the Lamone River. The flooding eroded the railway embankment, rendering the line unusable. The executive project aimed to restore the embankment to allow the railway line to be used again.
Since the complete reconstruction of the embankment could not be carried out in a short period of time, a temporary solution was designed to ensure slope stability and safeguard the structures. A Larssen sheet piling was installed along approximately 67.5 meters: the first 52 meters were made with 15-meter-long Larssen 606 piles, while the remaining 15.5 meters were constructed using 16-meter-long Larssen 720 piles.
Furthermore, following a field test that revealed the impossibility of installing the sheet piles using the intended male-female interlocking system, an alternative solution was adopted: the creation of a reinforced concrete curb along the entire length of the intervention to form a top beam that would stabilize the sheet piles and ensure the safety of the structure.
The intervention enabled the restoration of the railway line's operation despite the damages caused by the flood.