Riverbed Threshold Consolidation

The intervention area is located along the Reno River valley, about 65 km south of Bologna and 30 km from Pistoia, on the border between the Emilia-Romagna and Tuscany regions, in the municipalities of Alto Reno Terme and Sambuca Pistoiese. All Ing s.r.l. supported Politecnica in drafting the entire executive project aimed at restoring the riverbed threshold of the Reno River at the railway bridge at km 68+832 of the Pistoia-Bologna line, known as the Ponte della Venturina, which is under the protection of the Architectural Heritage Superintendence. The threshold, made of sandstone blocks, had suffered severe erosion due to the river's flow. The intervention, requested by RFI, aims to restore the proper function of the threshold to protect the bridge and railway track, while respecting the environmental and landscape characteristics of the area and the river’s hydraulic regime. The project phases included the removal of the eroded stone blocks, restoration of the base for laying the new blocks, and the installation of new stone elements similar to the existing ones, anchored to the underlying structure with grout. A critical aspect of the project was the planning of construction phases, which included river water management and material supply via helicopter due to the difficult access caused by the surrounding terrain's morphology.
Tipo di incarico
Executive Design
Committente
Salcef Group S.p.A., R.F.I. S.p.A.
Luogo
Ponte della Venturina (BO)
Anno
2022 – 2024