Landslide Consolidation at Casciano
Following the weather and flooding events that affected Northern Italy in 2024, a hydrogeological instability was observed in the Casciano area in Corbezzi, municipality of Pistoia (PT). Specifically, along the slope above the Casciano Tunnel, between km 50+948 and km 50+748 of the Bologna-Pistoia railway line, the fall of rocks and significant soil erosion were observed, which affected the roads in the small town.
Due to a substantial longitudinal fracture along the slope, caused by the heavy rainfall, an emergency intervention was planned in agreement with RFI and local authorities.
The project included an initial phase of securing the village of Casciano through the supply and installation of approximately 800 geoblocks, which were essential for creating a construction site track, reshaping the entire mountain above the building complex, and subsequently providing and installing reinforced rock netting for soil support. Additionally, a micropile wall was installed over an 80-meter stretch, covered with prefabricated concrete walls, finished with natural stones for proper integration into the landscape context.