Crostolo Steel Bridge

The bridge over the Crostolo stream, located between Guastalla and Gualtieri at km 30+340 of the Parma-Suzzara-Poggio Rusco railway line, underwent a structural intervention to allow the tensioning of cables, which had been obstructed by the existing bracing, as part of the electrification works for the railway corridor. The structure, made of steel with a single span of approximately 44.10 meters, features a single track and a truss arch. The intervention primarily focused on modifying the upper bracing, which hindered the installation of the new overhead contact line for the electric traction system. To accommodate the electrification requirements, the number of bracing elements was reduced from nine to five, using members with reduced inertia to increase the useful height and allow the passage of electrical cables. The transverse stabilization of the arches was achieved by inserting easy-to-install composite profiles, minimizing on-site welding and drilling of existing profiles. Another goal of the project was to optimize construction time, given the brief duration of the railway service interruption, which was limited to only two months.
Tipo di incarico
Executive Design
Committente
FER
Luogo
Guastalla (RE)
Anno
2024
cross